Overview

Implementation

ADOT Projects by Corridor

ADOT Projects by County

Local Projects

Local Government

Advertised Projects

Recovery News

Forms

Certifications

Contact Us

Tell Us Your Story

Other State and Federal Resources

ADOT Recovery Act Home Page

Arizona Information Related to the Arizona Recovery and Reinvestment Act of 2009

ARRA Overview

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was signed into law by President Obama on Feb. 17. It includes measures to modernize our nation's infrastructure, enhance energy independence, expand educational opportunities, preserve and improve affordable health care, provide tax relief and protect those in greatest need. More...

ADOT will receive an estimated $350 million for highway and bridge projects statewide under the Recovery Act. Funding will be allocated to regions in Arizona according to state formula, as follows: approximately $130 million for Maricopa County, $46 million for Pima County and $175 million for Arizona’s 13 other counties.

On March 13, 2009, the Arizona State Transportation Board decided that 41 shovel-ready highway projects across Arizona would advance with federal funding from the Recovery Act. Of the 41 highway projects statewide, five are in Maricopa County, eight are in Pima County and 28 are located in Arizona’s 13 other counties. Since then, other “projects of opportunity” have been added as cost savings on initial construction projects are reinvested in additional transportation projects across Arizona.

Construction contracts have been awarded for nearly all projects, and approximately half the projects have been completed. All transportation projects funded by the Recovery Act must be completed within three years.

These projects are designed to put Arizonans back to work and are estimated to create more than 6,000 direct construction jobs statewide, while improving the state highway system. Of the estimated jobs created, 2,180 are in Maricopa County, 760 are in Pima County and 3,080 are estimated to be created throughout greater Arizona.

“The transportation projects supported by economic recovery funds will benefit every Arizonan,” said Governor Janice K. Brewer. “The creation of jobs is vital to our economy, and so are stronger connections between communities and our neighboring states. Arizonans will return to work and our roads will get the improvements they need.” Close

 

Approved Recovery Act Funded Projects in Arizona

 

MAP#
ROUTE
PROJECT NAME
ESTIMATE CONTRACT AMOUNT  CONTRACTOR  DATE  AWARDED 
 COUNTY 
TYPE OF PROJECT
PROJECT DESCRIPTION
 PROJECT  STATUS

Map #39
   
I-8

US 95 to Araby Road

$780,000

$254,502

D & O Contractors

9/18/09

Yuma

Safety fence replacement

Removal of existing fencing and installation of new chain link fencing for 6.25 miles along both sides of I-8

Under Construction

Map #1
   
I-10

Luzena to Bowie eastbound

$3,000,000

$1,133,096

FNF Construction

7/17/09

Cochise

Pavement preservation

Repave five miles of I-10, 13 miles east of Willcox

Under Construction

Map #2
   
I-10

East Benson to Johnson Road eastbound

$11,000,000

$5,541,928

FNF Construction

6/02/09

Cochise

Pavement preservation

Repave 14 miles of I-10 east of Benson

Under Construction

Map #40
   
I-10

Tucson District microseal

$1,400,000
Includes microseal project on SR 82

$941,498
Includes microseal project on SR 82

Southwest Slurry Seal

8/14/09

Cochise

Microseal

Apply microseal surface treatment to I-10 milepost 323-328 and 333-336

Under Construction

Map #3
   

I-10

Verrado Way to Sarival Avenue

$43,200,000

$21,800,000

Fisher Sand & Gravel, dba Southwest Asphalt Paving

7/17/09

Maricopa

Widen roadway

Add one lane in each direction on a six-mile segment of I-10 in the West Valley

Under Construction

Map #4
   
I-10

Rita Road to Houghton

$6,000,000

$2,414,828

Granite Construction

6/19/09

Pima

Pavement preservation

Repave two miles of I-10 in Tucson east of the downtown area

Completed

Map #62
   
I-10

Vail Road to the Pima County Line

$290,000

$160,655

Sun State Builders

9/18/09

Pima

Safety fence replacement

Remove and replace fencing along I-10 between the Vail Road interchange at milepost 279 to the Pima/Cochise County border

Under Construction

Map #5
   
I-10

Valencia to I-19

$9,100,000

 

 

 

Pima

Freeway management system

Bid

Map #6
   
I-10

Cienega Creek to Marsh Station(Marsh Station interchange reconstruction)

$24,000,000

$10,380,840

FNF Construction

9/18/09

Pima

Traffic interchange reconstruction

Relocate Marsh Station interchange and construct subgrade for relocation of railroad line

Under Construction

Map #7
   
I-10

Picacho Peak to town of Picacho

$30,000,000

$13,133,079

Ashton Construction

7/17/09

Pinal

Roadway widening

Widen a 5.7-mile segment of I-10 to three lanes in each direction

Under Construction

Map #8
   

I-17

SR 74 to Anthem Way

$22,300,000

$11,750,000

Markham Contracting

6/19/09

Maricopa

Widen roadway

Add one lane in each direction on a 4.8-mile segment of I-17 from SR 74 (Carefree Highway) to Anthem Way; repave roadway from Anthem Way to New River Road

Under Construction

Map #43
   
I-17

Table Mesa Road to Rock Springs

$190,000

$86,535

RK Sanders

6/19/09

Maricopa

Safety fence replacement

Removal of existing fencing and installation of new barbed wire fencing for six miles along the west right of way line of I-17

Completed

Map #9
   
I-19

Milepost 0 to 63

$1,500,000

 

 

 

Pima

Sign replacement

Pre-bid

Map #63
   
I-19

Rio Rico Drive to Chavez Siding Road

$435,000

$294,534

Falcone Brothers & Assoc.

10/16/09

Santa Cruz

Safety fence replacement

Removal of existing fence and installation of new barbed wire fence along both sides of I-19 and the I-19 frontage roads between mileposts 11 and 24.2, approximately 11 miles north of Nogales

Under Construction

Map #45
   
I-40

I-40 Frontage road

$790,000
Includes chip seal projects on SR 87, SR 264

$561,876
Includes chip seal projects on SR 87, SR 264

Grady’s Quality Excavating

7/17/09

Apache

Chip seal

I-40 south frontage road, five miles from New Mexico border

Under Construction

Map #10
   
I-40

Dead River bridge eastbound

$280,000

$120,155

Bison Contracting

6/19/09

Apache

Bridge rehabilitation

Construction of a concrete floor beneath the eastbound I-40 bridge over Dead River, 17 miles west of Chambers

Completed

Map #11
   
I-40

Black Creek bridge numbers 1134, 1642 and 954

$700,000

$365,000

Bison Contracting

6/02/09

Apache

Bridge rehabilitation

Construction of concrete floors beneath the I-40 bridges over Black Creek, seven miles east of Sanders

Completed

Map #12
   
I-40

Walnut Canyon

$12,000,000

$5,808,917

CS&W Contractors

6/02/09

Coconino

Reconstruct roadway

Reconstruct four miles of westbound I-40, 10 miles east of Flagstaff, including on and off ramps at Cosnino Road

Under Construction

Map #44
   
I-40

SR 64 to Volunteer Wash

$800,000

$287,411

American Fence

7/17/09

Coconino

Safety fence replacement

Removal of existing barbed wire fence and installation of barbed wire game fence along both sides of I-40 from milepost 166 to 174 and milepost 183 to 188

Completed

Map #48
   
I-40

Milepost 150-191

$590,000

$479,105

Southwest Slurry Seal

7/17/09

Coconino

Microseal

Apply microseal surface treatment to 41 miles of I-40 beginning five miles east of Ash Fork

Completed

Map #61
   
I-40

Railroad Avenue – Rattlesnake Wash

$620,000

$406,000

RK Sanders

6/02/09

Mohave

Safety fence replacement

Installation of chain link fence and removal of existing barbed wire fence for three miles along both edges of the I-40 right of way, and intermittent sections of fence in the median

Completed

Map #49
   
I-40

State Line – Oatman Interchange

$300,000

$162,880

Abbco Sign Group

8/14/09

Mohave

Safety fence replacement

Removal of existing barbed wire fence and installation of new barbed wire fence along both sides of I-40 from milepost 0-3, the north side from milepost 16-20, and the south side from milepost 40-44

Completed

Map #13
   
US 60

Timber Mountain to Seneca

$5,000,000

$2,782,179

Fisher Sand & Gravel, dba Southwest Asphalt Paving

5/15/09

Gila

Pavement preservation

Repave eight miles of US 60 just west of the Salt River Canyon on the San Carlos Apache Reservation

Completed

Map #14
   
US 60

Miami City Limit to McMillan Wash

$10,600,000

$4,454,085

Meadow Valley Construction

6/19/09

Gila

Pavement preservation

Repave 8.3 miles of US 60 in Miami and Globe and upgrade traffic signals in Miami

Under Construction

Map #15
   

US 60

99th Avenue to 83rd Avenue

$11,200,000

$6,491,842

Pulice Construction

8/14/09

Maricopa

Widen roadway

Widen 1.8 miles of US 60 (Grand Avenue) to provide an additional lane in each direction

Under Construction

Map #16
   

US 60

Loop 303 to 99th Avenue

$45,000,000

$17,969,700

Markham Contracting

11/20/09

Maricopa

Widen roadway

Widen 10.1 miles of US 60 (Grand Avenue) to provide an additional lane in each direction

Awarded

Map #50
   
US 60

West side of Wickenburg

$620,000

$290,608

Southwest Slurry Seal

8/14/09

Maricopa

Microseal

Apply micro seal surface treatment to 2.6 miles of US 60 just west of Wickenburg from mileposts 107 to 110

Completed  

Map #17
   
SR 69

Junction I-17 to Big Bug Creek

$4,600,000

$1,899,987

Fann Contracting

6/02/09

Yavapai

Pavement preservation

Repave four miles of SR 69 from Interstate 17 to Big Bug Creek Bridge #1

Completed

Map #18
   
US 70

8th Avenue intersection

$191,000

$133,331

J Banicki Construction

7/17/09

Graham

Intersection improvement

Restripe the 8th Avenue intersection in Safford to accommodate truck traffic better; also install battery-powered backup for traffic lights along US 70 and US 191 to eliminate the need for police enforcement during power failures

Under Construction

Map #51
   
SR 73

Cedar Creek to Canyon Day

$500,000

$257,143

D&O Contractors

8/14/09

Gila

Safety fence replacement

Removal of existing fencing and installation of new barbed wire fencing for 10.6 miles along both edges of the SR 73 right of way

Completed

Map #64
   
SR 74

Mileposts 19.56-22.68

$3,900,000

$1,915,892

Nesbitt Contracting Co.

10/16/09

Maricopa

Passing lanes

Install 3.12 miles of passing/climbing lanes on both eastbound and westbound SR 74 between mileposts 19.56 and 22.68

Under Construction

Map #65
   
SR 75

York Valley

$300,000

$225,421

Bison Contracting Co.

10/16/09

Greenlee

Pedestrian Walkway

Install a six-foot-wide pedestrian walkway on SR 75 within the town of York Valley between mileposts 395.77 and 396.25 (0.48 mile)

Awarded

Map #19
   
SR 80

Tombstone streets

$1,100,000

$621,909

Combs Construction Company

6/19/09

Cochise

Pavement preservation

Repave approximately one mile of roadway on SR 80 (Fremont Street) in Tombstone; also, fill in existing median interiors with concrete to eliminate maintenance needs and beautify (permanently removing the accumulation of weeds/trash)

Completed

Map #52
   
SR 80

Double Adobe to Douglas

$820,000

$334,000

D&O Contractors

6/02/09

Cochise

Safety fence replacement

Removal of existing fencing and installation of new barbed wire fencing for 14 miles along both edges of the SR 80 right of way

Under Construction

Map #41
   
SR 82

Tucson District microseal

$1,400,000
Includes microseal project on I-10

$941,498
Includes microseal project on I-10

Southwest Slurry Seal

8/14/09

Santa Cruz

Microseal

Apply microseal surface treatment to SR 82 milepost 1.2-3.1 and 28-33

Under Construction

Map #20
   
SR 83

Sonoita north

$2,750,000

$1,873,811

Granite Construction

6/02/09

Santa Cruz

Pavement preservation

Repave approximately 10 miles of SR 83 north from SR 82

Under Construction

Map #42
   
SR 85

Southern Avenue to I-10

$18,600,000

$9,201,888

Pulice Construction

9/18/09

Maricopa

Widen roadway

Construct two miles of divided highway from Southern Avenue north to the SR 85/I-10 interchange

Under Construction

Map #21
   
SR 86

Santa Cruz River bridge number 528

$200,000

$125,828

Granite Construction

6/19/09

Pima

Bridge deck rehabilitation

Remove and patch the deteriorated areas of the bridge deck and overlay the total length of the bridge with epoxy polymer

Completed

Map #22
   
SR 86

Milepost 73.9 to 74.9 and milepost 76.6 to 77.4

$3,300,000

$1,702,640

Combs Construction Company

7/17/09  

Pima

Widen shoulder

Widen the roadway shoulders and add turn lanes on SR 86, 21 miles east of Why

Under Construction

Map #23
   
SR 86

Kinney Rd. to La Cholla Blvd.

$4,100,000

$2,112,411

Southern Arizona Paving

7/17/09

Pima

Pavement preservation

Repave 3.1 miles of SR 86 from Kinney Road to La Cholla Blvd.; widen the intersection of Camino de Oeste, add turn lanes, and install a traffic signal

Under Construction

Map #24
   
SR 86

Brawley Wash segment

$5,000,000

$1,224,606

Southern Arizona Paving

7/17/09

Pima

Widen roadway

Repaving, culvert extension and shoulder buildup on a 2.5-mile segment of SR 86, 25 miles west of Tucson

Under Construction

Map #46
   
SR 87

Milepost 317-322

$790,000
Includes chip seal projects on I-10, SR 264

$561,876
Includes chip seal projects on I-10, SR 264

Grady’s Quality Excavating

7/17/09

Coconino

Chip seal

SR 87, 25 miles south of Winslow

Under Construction

Map #25
   
SR 87

Payson to Pine

$6,800,000

$3,722,743

Bison Contracting

5/15/09

Gila

Widen shoulder

Safety improvements on two one-mile segments of SR 87, one mile north of Payson and one mile south of Pine; work will include widening the roadway shoulders, repaving, installing new guardrail and making safety improvements

Under Construction

Map #53
   
SR 87

Payson to Pine Fencing

$800,000

$320,926

Empire Excavation

7/17/09

Gila

Safety fence replacement

Removal of existing fence and replacement of barbed wire fence along both edges of the right of way from milepost 254.5 to 266.7

Completed

Map #26
   
US 89

Townsend to Fernwood

$7,000,000

$3,652,195

Meadow Valley Construction

5/15/09

Coconino

Pavement preservation

Repave 5.5 miles of US 89 just north of the Flagstaff city limits

Completed

Map #27
   
US 93

Southbound Ranch Road

$13,000,000

$5,857,065

Ames Construction

7/17/09

Mohave

Construct parallel roadway

Construct a southbound roadway two miles long parallel to existing US 93 to create a four-lane divided highway 17 miles north of Wikieup

Under Construction

Map #28
   
US 95

Peligro to Clarks

$13,500,000

$6,816,250

Fisher Sand & Gravel, dba Southwest Asphalt Paving

9/18/09

La Paz

Pavement preservation and pipe liners

Selected milling and overlaying of asphalt pavement, polyethylene lining of existing corrugated metal pipes, and extension of existing CMP pipes at a ford wall

Under Construction

Map #29
   
SR 95

Passing lanes south of Bouse Wash

$2,000,000

$1,279,002

Combs Construction Company

6/19/09

La Paz

Construct passing lanes

Construct passing lanes one mile in length south of Bouse Wash (near junction of SR 72 between Quartzsite and Parker)

Completed

Map #30
   
US 95

Arizona Avenue to Yuma Palms Pkwy

$12,820,000

$8,962,995

Royden Construction Company

8/14/09

Yuma

Widen roadway/bridge

Reconstruct and widen .71 miles of the existing roadway to a six-lane urban arterial

Under Construction

Map #54
   
US 95

North of Yuma

$700,000

$397,937

Cactus Transport

8/14/09

Yuma

Chip seal

9.7 miles of US 95 beginning 22 miles north of Yuma

Completed

Map #31
   

Loop 101

Beardsley Road
Union Hills Drive

$25,000,000

$14,771,227

Haydon Building Corp.

10/16/09

Maricopa

Traffic interchange/widen bridge

Construct a new u-turn bridge across Loop 101 just north of the Union Hills Drive traffic interchange to provide a new on-ramp from Beardsley Road, construct a new frontage road on the west side of Loop 101, widen the Union Hills Drive interchange bridge to provide additional lanes, construct new on and off-ramps and make other related improvements

Under Construction

Map #32
   
US 160

Junction US 89 to Van's Trading Post

$4,900,000

$2,947,263

Granite Construction Co.

5/15/09  

Coconino

Pavement preservation

Repave eight miles of US 160 on Navajo Reservation

Completed

Map #33
   
US 160

Kayenta to Junction North 59

$13,300,000
Includes Junction North 59 to Dennehotso

$8,147,258
Includes Junction North 59 to Dennehotso

Fann Contracting

5/15/09  

Navajo

Pavement preservation

Repave 27 miles of US 160 on Navajo Reservation

Completed

Map #34
   
US 160

Junction North 59 to Dennehotso

$13,300,000
Includes Kayenta to Junction North 59

$8,147,258
Includes Kayenta to Junction North 59

Fann Contracting

5/15/09  

Navajo

Pavement preservation

Repave 27 miles of US 160 on Navajo Reservation

Completed

Map #55
   
SR 177

Globe District

$670,000
Includes chip seal project on SR 288

$454,394
Includes chip seal project on SR 288

Cactus Transport

7/17/09

Gila

Chip seal

Seven miles of SR 177 beginning five miles south of Superior

Completed

Map #57
   
US 180

Holbrook to Petrified Forest Road

$1,000,000

$458,998

D&O Contractors

7/17/09

Navajo

Safety fence replacement

Removal of existing fencing and installation of new barbed wire fencing for 17.6 miles along both sides of the US 180 right of way

Under Construction

Map #35
   
US 191

South of Chinle

$4,000,000

$2,512,165

Granite Construction Co.

6/02/09

Apache

Pavement preservation

Repave 8.3 miles of US 191, 10 miles south of Chinle

Completed

Map #36
   
US 191

Sunsites at High Street

$595,000

$327,000

CKC Materials and Construction

6/02/09

Cochise

Widen roadway

Widen pavement to construct right turn and left turn lanes

Completed

Map #37
   
US 191

Lower Coronado Trail at milepost 173

$560,000

$320,555

Bison Contracting Company

9/18/09

Greenlee

Drainage improvement

Under Construction

Map #38
   
US 191

Black Hills Back Country Byway at milepost 159.5

$1,000,000

$567,178

CKC Materials and Construction

6/19/09

Greenlee

Intersection improvement

This is Phase III of an intersection project at US 191 and the north entrance of the Black Hills Back Country Byway. The intersection has poor sight distance and it is difficult for large trucks to maneuver through the intersection. Phase I installed drainage features, Phase II built a new alignment, and this phase will create a new intersection to match the new alignment.

Under Construction

Map #58
   
SR 260

Porter Mountain Rd to Woodland Rd

$481,000

$272,205

Falcone Brothers & Assoc.

10/16/09

Navajo

Lighting and landscaping

Landscaping and pedestrian lighting along SR 260

Awarded

Map #47
   
SR 264

Milepost 426-430

$790,000
Includes chip seal projects on I-10, SR 87

$561,876
Includes chip seal projects on I-10, SR 87

Grady’s Quality Excavating

7/17/09

Apache

Chip seal

SR 264, 24 miles west of Ganado

Completed

Map #59
   
SR 277

Milepost 306 to 313

$550,000

$276,306

Southwest Slurry Seal

7/17/09

Navajo

Slurry seal

Apply slurry seal to seven miles of SR 277 east of Heber

Completed

Map #56
   
SR 288

Globe District

$670,000
Includes chip seal project on SR 177

$454,394
Includes chip seal project on SR 177

Cactus Transport

7/17/09

Gila

Chip seal

Two miles of SR 288 beginning two miles south of Young

Completed

N/A
Statewide

 

 

 

 

Various

Pipe culvert rehabilitation

Statewide pipe culvert rehabilitation project on I-8, I-10, I-19, SR 70, SR 77, SR 79, SR 82, SR 85, SR 86, SR 87, SR 260, SR 286, SR 386 and SR 387

Awarded

 

 